Client: Conuma Resources

Timeline: August 2025 - September 2025

Project Value: $650 Thousand

Location: Tumbler Ridge, BC

OCL is replacing the clean coal screen at Conuma Resources' Tumbler Ridge operation. Scope begins with pre-assembly of key components to streamline field execution, followed by demolition and removal of existing equipment. The team then installs new structural steel before completing the screen and belly pan installation, fully integrated with required chutes and process piping to restore reliable material flow.

  • Mining
  • Rebuild
  • Demolition
  • Construction
  • Screening
  • Piping
  • Inspection