TECK SPATSUM RIVER WATER INTAKE REINSTATEMENT
TECK SPATSUM RIVER WATER INTAKE REINSTATEMENT

Client: Teck

Timeline: March 2025 - October 2026

Project Value: $15 Million (Est.)

Location: Logan Lake, BC

Teck called on OCL when serious water supply issues threatened operations at the Highland Valley Copper Mine. OCL is evaluating the current condition of the Raw Water Intake system, dormant for seven years, and developing a full reinstatement plan. This work builds on OCL's ongoing engagement with Teck on tailings line integrity and other high priority projects.

  • Civil / Structural
  • Piping
  • Mechanical
  • Schedule Driven
  • Electrical
  • Commissioning
  • EPC
TECK SPATSUM RIVER WATER INTAKE REINSTATEMENT
TECK SPATSUM RIVER WATER INTAKE REINSTATEMENT
TECK SPATSUM RIVER WATER INTAKE REINSTATEMENT
No items found.