DOW PATH TO ZERO LP8 FABRICATION
DOW PATH TO ZERO LP8 FABRICATION

Client: Dow

Timeline: December 2024 - March 2025

Project Value: $250 Thousand

Location: Fort Saskatchewan, AB

As part of Dow's Path to Zero Project, OCL was awarded the offsite fabrication scope for the LP8 ISBL Area. The package covers approximately 1,800 FDI of 30 inch, 36 inch and 42 inch heavy wall pipe, with shop hydro-testing, NDE, and coating self-executed by OCL's in-house coating team.

  • Fabrication
  • Coating
  • NDE
  • Path to Zero Project
  • Hydrotest
  • 1,800 FDI
  • Piping Systems