CNRL MFT PIPELINE

Client: CNRL

Timeline: April 2016 - November 2018

Project Value: $10 Million

Location:

PROJECT:

▪ 11km of 28” x 0.750 underground pipeline.

▪ Pipeline: string; weld; external blasting & coating; ethafoam boxes; tie-ins; NDE.

▪ Civil: excavate ditch; backfill; berm; road maintenance.

▪ Crossings: Casing spacers; road sleeve installation.

▪ Vacu-lift was used for loading pipe from stock pile.

▪ Constructed on narrow RoW.

▪ Interface Management: operations; other contractors.