KEARL DREDGE ILF FSSU
KEARL DREDGE ILF FSSU

Client: Imperial Oil

Timeline: April 2023 - November 2024

Project Value: $15-25 Million

Location: Kearl Lake, AB

The Dredge In-Line Flocculation Flow Splitter Scale-Up Project relocated and modified Imperial Oil's existing ILF system for permanent fines treatment operation at Kearl. OCL self-performed engineering, procurement and construction across three major work scopes: relocation of two offshore dredges, installation of a Fine Fluid Tailings pipeline, and installation of a chemical injection pipeline requiring fabrication of two pumps.

  • Civil
  • Piping
  • Electrical
  • Chemical
  • Pump Fabrication
  • Dredge Relocation
  • EPC