
OCL mitigated accelerated erosion risk along the Logan River Line 18 crossing for Enbridge. The scope required diversion of river water to isolate the at-risk area, followed by installation of armouring material including riprap, ACB mattresses and aggregates to permanently stabilize the crossing.

