
OCL delivered a comprehensive mechanical and structural work program at Keyera South Cheecham, providing full-cycle support from engineering through execution. Scope included off-site and on-site piping fabrication, demolition, installation of new and modified piping systems, and replacement of critical components such as valves, expansion joints, rupture discs, PSVs, and guided wave chambers. Structural steel fabrication and installation were completed alongside conveyor system and pump work to keep the facility running.
