INTER PIPELINE PERSIST LACT SKID
INTER PIPELINE PERSIST LACT SKID

Client: Inter Pipeline

Timeline: December 2024 - July 2025

Project Value: $100 Thousand

Location: Persist, AB

OCL was awarded the design build, working alongside IPL engineering on construction and fabrication of a new LACT (Lease, Automatic, Custody, Transfer) skid for Inter Pipeline's Persist site. OCL fabricated and coated the skid in-house before shipping the final product for field installation, with scope covering metering calibration equipment, piping, structural fabrication, hydro testing, coating, and all electrical and instrumentation work.

  • Piping
  • Fabrication
  • LACT Skid Construction
  • E&I
  • Hydrotest
  • Planning
  • Coating