ENBRIDGE SUNDAY CREEK TANK TERMINAL
ENBRIDGE SUNDAY CREEK TANK TERMINAL

Client: Enbridge Pipelines

Timeline: September 2013 - September 2014

Project Value: $20 Million

Location: AB Hwy 881

OCL served as General Contractor for site-wide subgrade preparation and final grade completion of tank pads and the entire facility at Sunday Creek. Scope included containment berms, ponds and geotech liners, roads, ramps and deep underground installations, manholes, catch basins and HDPE piping, plus dewatering and final environmental remediation.

  • Containment Berms / Ponds / Geotech Liners
  • Roads / Ramps / Deep Underground
  • Manholes / Catch Basins / HDPE Piping
  • Dewatering / Final Environmental Remediation