Located at the Imperial Oil Kearl site, the Enbridge Woodland Metering Station required new 24 inch and 36 inch below and above ground piping, fabrication and installation of a metering skid, a 5 tonne overhead crane, CIP piles, structural steel, and a 480V MCC with surge relief system. OCL self-performed piling and foundations, piping, mechanical, electrical and instrumentation, heavy lifts, hydrotesting and final tie-ins.